Skip to main content
FEATHER & DOWN PROCESSING EQUIPMENT
Down Jacket Dismantling Machine
1 / 2

Down Jacket Dismantling Machine

Whole-garment feeding · Separate down and fabric recovery

A continuous processing line for used down jackets, combining conveyor feeding, garment shredding, down–fabric separation and enclosed down collection. Separate material outputs reduce manual dismantling and support recycling.

Product Inquiry

Design preview. Form submission is not enabled.

Whole garments in. Down and fabric recovered separately.

Designed for recycling used down jackets, this line combines conveying, garment shredding, down–fabric separation and down collection in a continuous process. Whole garments are fed onto the conveyor, while separated down and fabric fragments are collected through dedicated routes for further processing and reuse.

How it works

  1. 01 · Continuous feeding

    Used down jackets enter the processing unit on a conveyor, reducing the need to dismantle garments individually by hand.

  2. 02 · Shredding and separation

    The equipment shreds the garments and separates down from fabric fragments into different collection routes.

  3. 03 · Separate collection

    Down is conveyed through ductwork into the collection room. Fabric fragments leave through a separate outlet for baling and further use.

Equipment features

  • Continuous operationConveyor feeding connects the processing stages and supports a continuous production workflow.
  • Less manual dismantlingMechanical garment processing reduces the need for individual hand dismantling.
  • Material recoverySeparate down and fabric outputs make it easier to arrange subsequent processing for each material.
  • Enclosed down collectionDucted conveying and enclosed collection help reduce scattered down and simplify workplace cleaning.

Configuration and planning

Share your garment types, target throughput and available floor space with Tengyu to discuss the equipment configuration and layout. Capacity, power requirements, dimensions and supporting equipment are specified in the agreed technical proposal.